Pacific Blue Reflective Long Lead - 30ft, coiled with black carabiner, shown on white background.
A black and white dog in a pink harness and purple bandana stands on its hind legs, placing a paw on a person’s hand. The person holds the Pacific Blue Reflective Long Lead - 30ft. Grass is visible in the background.
A golden retriever in a pink harness is secured to the Pacific Blue Reflective Long Lead - 30ft outside an orange and green tent at a forest campsite with autumn leaves on the ground.
A black and white dog in a pink bandana stands on a grassy path, attached to the 30ft Pacific Blue Reflective Long Lead held by a person in jeans, with green foliage surrounding them.

Pacific Blue Reflective Long Lead - 30ft

Regular price
$48.00
/
Shipping calculated at checkout.

📦 Ships next business day from California.

Product Details

Still working on your recall? Grab a 30 foot rope leash to give your dog room to roam, while still keeping him safe. Our long lead is also great to use as a tie-out while camping. (*But don't leave dogs unattended on a tie-out!) 

  • Length: 30 ft
  • Made with tightly spun, polypropylene/polyester ⁵⁄₁₆ in rope
  • Woven with reflective strands for use in low or no light conditions
  • Aluminum carabiner swivels and locks
    • Carabiner width: 1.5 in
    • Carabiner length: 2.5 in
    • Rated for 3 kN
  • Suitable for all dogs
Care
  • Wash by hand with warm water and mild soap. Thoroughly swish it around, then drain the dirty water. Repeat until the water runs clean.
  • Hang or lay flat to dry, uncoiled, away from direct sunlight
  • Towel dry any hardware immediately after washing